INSP-Final Inspection | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Small Sprinkler T.I. in Black Eagle Plaza suite #115 Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Issue and Print Permit | | | 7/1/2019 | | DONE |
|
|
|
|
Application received | | | 6/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 28 2019 11:16AM
|
Intake Approval | | | 6/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 6/28/2019 | | 6/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 6/28/2019 | | 6/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
met
|