INSP-Final Inspection | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Sync issue has been approved by Boise Fire.
Thanks Troy Have a terrific day. Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
INSP-Alarm Testing | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled as per Boise Fire.
Hi Troy. Chief Johnson is going to let the synchronization slide for now. any future TIs in this location will more than likely require Hampton to Upgrade their fire alarm system. Let me know if this is just a sign off on your end or if we need to meet on site. Thanks Mike Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
INSP-Alarm Testing | 7/31/2019 | 8/1/2019 | 8/1/2019 | P | DONE |
Troy Cobbley
|
|
|
I met mike and witnessed the notification changes mike had made. I can still hear the two different horn temporal rythms from either side of the walls. I let cheif Ron know of my findings.
Michael Phone #: ###-####
|
Permit Ready to Issue | | | 7/31/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/31/2019 | | DONE |
|
|
|
|
1st review completed | | | 7/31/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 7/31/2019 | | 7/31/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/31/2019 | | DONE |
|
|
|
As built - No fee.
|
CHANGE STATUS TO (ISS) | | | 7/31/2019 | | DONE |
|
|
|
this was not put in ISS status after as built
|
Plan assigned to (Lee) | 7/25/2019 | | 7/31/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
INSP-Alarm Testing | 7/24/2019 | 7/25/2019 | 7/25/2019 | P | FAIL |
Troy Cobbley
|
|
|
The notification (horns) did not sync as required per NFPA 72 18.4.2.4. Need as-builts approved. Thanks for coming out yesterday Troy. I apologize for the inefficiency. I (We) know better than to waist your time. Learned something new about the spare Simplex NAC output used as a trigger. Call me when you feel you can make it. Thanks Mike Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
Plan resubmittals received | | | 7/25/2019 | | DONE |
|
|
|
as built per Michae at M2 Automation
|
INSP-Final Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | FAIL |
Troy Cobbley
|
|
|
The new notification circuit is not working.
Hi Troy This is the Hampton Inn Spectrum Hotel. I will call you this morning to set up an inspection this afternoon. Thanks Mike Timmerman. Phone #: ###-#### Inspection requested via web by Michael Timmerman
|
Plan assigned to (Lee) | 6/28/2019 | | 7/1/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/1/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 7/1/2019 | | 7/1/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
|
|
|
Passed with comments.
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 7/1/2019 | | DONE |
|
|
|
|
Application received | | | 6/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 28 2019 1:02PM
|