INSP-Final Inspection | 8/27/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover. Any and all holes in the insulation will need to be filled if removed due to freeze protection requirements, sheetrock is not installed on the bottom of the trusses as shown on city approved drawings but attic protection is sufficient enough for combustible space coverage.
Troy Lowe is the contact for inspection. He is requesting a RTC inspection. Thank you for your help. Have a nice day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
Intake Approval | | | 7/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/1/2019 | | 7/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/1/2019 | | 7/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/1/2019 | | DONE |
|
|
|
|
Application received | | | 6/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 28 2019 4:40PM
|