INSP-Final Inspection | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, irrigation shutdown was verified during waterflow. Final fire sprinkler inspection is complete.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Final Inspection | 10/3/2019 | 10/3/2019 | 10/3/2019 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler head on riser has been painted, head needs replaced. Irrigation shutdown is not hooked up to flow switch, irrigation did not shut down on flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection, rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover. Sticker was placed on window for cover approval.
jeremy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping between conditioned spaces approved for cover, piping in attic spaces that requires tenting will need to be inspected at a later date.
Jeremy Phone #: ###-####
|
Issue and Print Permit | | | 7/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/8/2019 | | 7/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/8/2019 | | 7/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/8/2019 | | DONE |
|
|
|
|
Application received | | | 7/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 4 2019 8:57AM
|