Permit Information
Permit NumberFIR19-00511
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 4184 S ORCHARD ST
Project NameTURBO AIR HANGER
Customer Number 
ePlanReviewYes
Description
THIS IS A GROUP II AIRCRAFT HANGER. TYPE II-B CONSTRUCTION. 29,423 sqft. ONE WET FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/10/20203/10/20203/10/2020PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection1/10/20201/13/20201/13/2020AFAIL
DetailsTroy Cobbley
Permit will need to be scheduled for a final when test papers have been emailed in as discussed.

Contact : George Jess - Final for Underground, Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/3/201912/4/201912/4/2019APASS
DetailsTroy Cobbley
Rough-in passed. FDC modification is still needed. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/2/201912/3/201912/3/2019PPASS
DetailsTroy Cobbley
Overhead hydro passed. George Jess is the contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/3/20199/4/20199/4/2019PPART
DetailsTroy Cobbley
**Partial Rough Inspection Pass** Inspection of pipe hangers prior to the installation of roof insulation**MAS**
Kenny Caldwell is the contact. This is to be a rough-in hanger inspection. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
Plan resubmittals received  7/17/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/17/2019 7/17/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  7/17/2019 DONE
DetailsMark Stumbaugh
Resubmittal Fee $110.25 x 2
Permit Ready to Issue  7/17/2019 DONE
met
Issue and Print Permit  7/17/2019 DONE
Plan resubmittals received  7/15/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/15/2019 7/15/2019 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  7/12/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check7/12/2019 7/12/2019 FAIL
DetailsMark Stumbaugh
Sprinkler Plan Check7/10/2019 7/11/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  7/10/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)7/10/2019 7/10/2019 DONE
DetailsMark Stumbaugh
Application received  7/8/2019 DONE
Application submitted via PDS Online on Jul 8 2019 5:02PM