INSP-Final Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | A | FAIL |
Jim Page
|
|
|
Bell needs to be moved closer to front of house as discussed. Could not rest irrigation shutdown during water flow, no zones hooked up.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2019 | 11/13/2019 | 11/13/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, rough to cover inspection for overhead fire sprinkler piping complete, foam insulation has been placed in the top cord pockets above the sprinkler piping so no tenting installed, cover is approved. Official hydro to be completed at a later date after permenant heat is established and operational as discussed.
Overhead rough, hydro, tenting. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan assigned to (Stumbaugh) | 11/8/2019 | | 11/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
as built
|
Sprinkler Plan Check | 11/12/2019 | | 11/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 2 hrs
No new devices
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
PLAN MOD fee due
|
CHANGE STATUS TO (ISS) | | | 11/12/2019 | | DONE |
|
|
|
plan mod
|
Plan resubmittals received | | | 11/8/2019 | | DONE |
|
|
|
Nate from Thorpe called for an as built workflow
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | FAIL |
Jim Page
|
|
|
Install does not match city approved drawings, notated about 6 areas on the city approved drawings, inspection was stopped.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
CHANGE STATUS TO (ISS) | | | 11/6/2019 | | DONE |
|
|
|
plan mod approved
|
Sprinkler Plan Check | 11/4/2019 | | 11/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 2hrs
No new devices
|
Permit Ready to Issue | | | 11/5/2019 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approval
|
Plan assigned to (Stumbaugh) | 11/1/2019 | | 11/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
as built request by Alicia from Thorpe Fire submitting fire sprinkler drawings, a cuple drawings and updated calculations.
|
INSP-Sprinkler Rough-in | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | CANC |
Troy Cobbley
|
|
|
Per conversation with the field superintendant plan modifications are needed showing the changes prior to a rough-in inspection. No inspectio was performed.
Ready any time. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan Modification Accepted | | | 11/1/2019 | | DONE |
|
|
|
as built request by Alicia from Thorpe submitting fire sprinkler drawings, a cuple drawings and updated calculations.
|
Issue and Print Permit | | | 7/22/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/15/2019 | | 7/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/15/2019 | | 7/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/15/2019 | | DONE |
|
|
|
met
|
Application received | | | 7/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 12 2019 3:30PM
|