INSP-Final Inspection | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete. ' 'Garrett Phone #: ###-####
|
INSP-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | CANC |
Troy Cobbley
|
|
|
Not all ceiling has been built/installed. Adam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Adam Phone #: ###-####
|
Issue and Print Permit | | | 7/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/17/2019 | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/17/2019 | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/17/2019 | | DONE |
|
|
|
met
|
Application received | | | 7/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 15 2019 1:45PM
|
Intake Approval | | | 7/15/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|