INSP-Final Inspection | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the piping above the hard lids. This piping can be covered.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Intake Approval | | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/17/2019 | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/17/2019 | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/17/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 7/17/2019 | | DONE |
|
|
|
|
Application received | | | 7/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 16 2019 3:56PM
|