INSP-Final Inspection | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Plan Modification Accepted | | | 7/23/2019 | | DONE |
|
|
|
as built plan mod-assinged to MAS
|
Plan assigned to (Stumbaugh) | 7/23/2019 | | 7/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
as built
|
Sprinkler Plan Check | 7/23/2019 | | 7/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
As Built Drawings - Approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Fee - As Built Drawings
|
Permit Ready to Issue | | | 7/23/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/23/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/22/2019 | | DONE |
|
|
|
|
Application received | | | 7/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2019 8:40AM
|
Intake Approval | | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 7/17/2019 | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 7/17/2019 | | 7/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 7/17/2019 | | |
|
|
|
met
|