Permit Information
Permit NumberFIR19-00531
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 287 N MAPLE GROVE RD
Project NameSSP Investments Warehouse
Customer Number 
ePlanReviewYes
Description
Installation of a new wet automatic fire sprinkler system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/13/201911/14/201911/14/2019APASS
DetailsTroy Cobbley
Permit finaled.

Call about 20 mins before // Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro10/21/201910/22/201910/22/2019APASS
DetailsTroy Cobbley
The underground hydro test was witnessed with no visible pressure loss.

Matt Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro10/21/201910/21/201910/21/2019PCANC
DetailsTroy Cobbley
Canceled due to time constraints. Matt- approved plans are in the riser room in yellow manilla folder Phone #: ###-####
Override - Parcel Holds10/21/20191/1/190010/21/2019  
this parcel hold is for the building permit on street lights
INSP-Sprinkler Rough-in/Hydro10/15/201910/16/201910/16/2019APASS
DetailsTroy Cobbley
The overhead hydro witnessed with no pressure loss. Overhead rough-in passed. I noted that the big a** fans are being installed and may cause obstruction problems. I also noted a piece of equipment being constructed that incorporates some combustible concealed spaces that will need to be addressed as well.

Call 30 mins ahead- Matt Phone #: ###-####
Override - Parcel Holds10/15/20191/1/190010/15/2019  
Not the building final
INSP-Supply line flush10/9/201910/10/201910/10/2019APASS
DetailsTroy Cobbley
The underground supply line flush was witnessed. . Phone #: ###-#### Inspection requested via web by Matt Barnard
INSP-Supply line flush10/8/201910/9/201910/9/2019PCANC
DetailsTroy Cobbley
This is going to be a supply line flush inspection. Please contact Heath Day prior to heading to job site at Phone #: ###-#### >> Inspection requested via web by Matt Barnard Inspection cancelled from web by: Matt Barnard
INSP-Sprinkler Rough-in9/17/20199/17/20199/17/2019PPASS
DetailsTroy Cobbley
Rough In Inspection is for the underground fire line passed. Piping can be covered. I noted that the remote PIV will need to have the tamper switch monitored by the fire alarm panel which will require wiring to be run. Please contact Matt Barnard one hour prior to heading to job site at Phone #: ###-#### Inspection requested via web by Matt Barnard
INSP-Sprinkler Rough-in8/9/20198/12/20198/12/2019APART
DetailsJim Page
Previously noted item for bury depth of IBR corrected, IBR is below 4foot 6 inches, IBR approved for cover, remaining undergorund to be installed at a later date.

Inspection of 6” In Building Riser. Please contact Matt Barnard one hour prior to showing up at Phone #: ###-#### Inspection requested via web by Matt Barnard
INSP-Sprinkler Rough-in8/7/20198/7/20198/7/2019AFAIL
DetailsTroy Cobbley
Inspection was for the IBR only. Piping is only at 3'-4 1/2" bury depth. 4'-6" is required to top of pipe. Need bury wire and plans/small documents.

Inspection of In Building Riser. Mega Lug to be installed and rodded back to 90 elbow once underground is installed. Contact Rick Fouts Phone #: ###-#### Inspection requested via web by Matt Barnard
Sprinkler Plan Check7/18/2019 7/19/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  7/19/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  7/19/2019 DONE
met
Issue and Print Permit  7/19/2019 DONE
Application received  7/18/2019 DONE
Application submitted via PDS Online on Jul 18 2019 7:12AM
Intake Approval  7/18/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)7/18/2019 7/18/2019 DONE
DetailsMark Stumbaugh