INSP-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final fire alarm inspection is complete.
2 Heat detectors have been installed in the penthouse per the alternate agreement to allow fire sprinklers to be omitted from penthouse.
Call ahead as I am not sure which tech will still be onsite. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
Fees Due Hold | 9/6/2019 | | 9/6/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Jim Page
|
|
|
Provide coverage in shadow area that is marked on city approved drawings. Provide city approved drawings for addition of heat detector in penthouse, penthouse is not shown on city approved drawings. Relocate A/V device that is blocked by ductwork. Access control system was not active at time of inspection, could not test mag lock release on general fire alarm.
Call ahead to Brian @ ###-####. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
Plan resubmittals received | | | 9/5/2019 | | DONE |
|
|
|
Lauren asked for eplan to be opended for as builts #2
|
Plan assigned to (Lee) | 9/5/2019 | | 9/5/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/5/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/5/2019 | | 9/5/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/5/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 9/5/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/5/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | FAIL |
Jim Page
|
|
|
As discussed with Kristen, battery fault was suppose to repaired with last tenant, battery fault was not repaired, as of this entry battery fault was still on panel, Kristen was informed that if fault was still on panel then inspection request would be a fail.
Damien Phone #: ###-####
|
Plan resubmittals received | | | 9/3/2019 | | DONE |
|
|
|
as built workflow per Kristin at Johnson Controls
|
Plan assigned to (Lee) | 9/3/2019 | | 9/3/2019 | | DONE |
Gemma Flores
|
|
|
as built
|
1st review completed | | | 9/3/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/3/2019 | | 9/3/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/3/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 9/3/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 9/3/2019 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 8/8/2019 | | 8/12/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/12/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/12/2019 | | 8/12/2019 | | PASS |
Lee G Meredith
|
|
|
|
Plan Modification Accepted | | | 8/12/2019 | | DONE |
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/12/2019 | | DONE |
|
|
|
Plan mod passed. No additional comments.
|
Permit Ready to Issue | | | 8/12/2019 | | DONE |
|
|
|
plan mod approved- do not re issue
|
CHANGE STATUS TO (ISS) | | | 8/12/2019 | | DONE |
|
|
|
plan mod
|
Plan Modification Accepted | | | 8/8/2019 | | DONE |
|
|
|
wrong set of plans went through review per kristin
|
Issue and Print Permit | | | 8/8/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/7/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 8/7/2019 | | 8/7/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/7/2019 | | DONE |
|
|
|
Passed as noted with review comments.
|
Permit Ready to Issue | | | 8/7/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 7/23/2019 | | FAIL |
|
|
|
Needs engineer of record approval. Returned to Kristin.
|
Application received | | | 7/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 22 2019 3:33PM
|