INSP-Final Inspection | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete, wiring for irrigation shutdown is correct as of this entry.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Jim Page
|
|
|
All tenting in place at time of inspection, overhead fire sprinkler piping approved for cover.
Tenting inspection Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Jim Page
|
|
|
Cover is not approved, tenting not installed correctly.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
Issue and Print Permit | | | 8/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/6/2019 | | 8/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/6/2019 | | 8/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
met
|
Application received | | | 7/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2019 11:24AM
|
Intake Approval | | | 7/29/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|