INSP-Final Inspection | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Rick Phone #: ###-####
|
Application received | | | 8/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2019 1:24PM
|
Intake Approval | | | 8/1/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit to be issued.
|
Intake Approval | | | 8/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/1/2019 | | 8/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/1/2019 | | 8/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/1/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/1/2019 | | DONE |
|
|
|
|