INSP-Final Inspection | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping is ok for cover. Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Issue and Print Permit | | | 8/2/2019 | | DONE |
|
|
|
|
Application received | | | 8/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2019 2:21PM
|
Intake Approval | | | 8/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/1/2019 | | 8/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/1/2019 | | 8/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/1/2019 | | DONE |
|
|
|
|