INSP-Final Inspection | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, as-builts will be sent to fire alarm plan reviewer. Final fire alarm inspection complete.
Paint Booth Shut-Down. Phone #: ###-#### Inspection requested via web by Robert Gobler
|
INSP-Final Inspection | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PART |
Jim Page
|
|
|
Partial final for fire alarm inspection complete, riser monitoring has been completed, need to have exhaust fan on paint booth needs to shut down during general fire alarm.
Phone #: ###-#### Inspection requested via web by Robert Gobler
|
INSP-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled to coincide with fire sprinkler inspection on 08AUG2019, this request cancelled per conversation with point of contact.
Phone #: ###-#### Inspection requested via web by Robert Gobler
|
Plan assigned to (Lee) | 8/6/2019 | | 8/6/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/6/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/6/2019 | | 8/6/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/6/2019 | | DONE |
|
|
|
Quick permit passed. No comments.
|
Permit Ready to Issue | | | 8/6/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/6/2019 | | DONE |
|
|
|
|
Application received | | | 8/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2019 1:29PM
|