INSP-Final Inspection | 10/23/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Inspection needs done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
|
INSP-Sprinkler Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Jim Page
|
|
|
Area of work is locked with no access, called point of contact, was informed that someone should be at space in ten minutes, waited for 15 minutes, still no access, proceeded to next inspection.
After 8:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
Intake Approval | | | 8/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/26/2019 | | 8/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/26/2019 | | 8/26/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 8/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/26/2019 | | 8/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/26/2019 | | DONE |
|
|
|
|
Application received | | | 8/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2019 4:09PM
|