INSP-Final Inspection | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Nate Phone #: ###-####
|
INSP-Final Inspection | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | FAIL |
Troy Cobbley
|
|
|
Bell not installed. No testing performed. Nate Phone #: ###-####
|
Issue and Print Permit | | | 9/5/2019 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/27/2019 | | 8/28/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/28/2019 | | DONE |
|
|
|
as per Mark Stumbaugh-same price as the cooking hood so he said to use that one.
|
Telephone call | | | 8/28/2019 | | DONE |
|
|
|
did not call Nate because Mark Stumbaugh emailed him that it was ready-permit is in the drawer
|
Plan resubmittals received | | | 8/27/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/21/2019 | | 8/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
resubmittal
|
Sprinkler Plan Check | 8/26/2019 | | 8/26/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 8/21/2019 | | DONE |
|
|
|
resumbittal for new plan set
|
Meeting | | | 8/21/2019 | | DONE |
|
|
|
Nate Brian from Iridium came in to do a resubmital and said the address needed to be corrected to 5600 because the project was on the whole building.
|
Application received | | | 8/7/2019 | | |
|
|
|
|
Plan assigned to (Stumbaugh) | 8/7/2019 | | 8/7/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 8/7/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/7/2019 | | 8/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|