Description
TVFP will install a complete wet pipe fire sprinkler system throughout the new building per NFPA 13 2016 for light hazard and ordinary hazard group II. Ceiling is 11’-0” throughout office space. The warehouse is open throughout to 18’-6” to deck. Low pile storage up to 12’-0”. Design density of .20/1500 for the warehouse ordinary group II. Office area design using extended coverage pendents at 17psi and density of .10/1500 for light hazard.9025 S. Federal Way Boise Idaho
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/21/20201/22/20201/22/2020PPASS
DetailsJim Page
As-builts have been submitted and approved. Final fire sprinkler inspection complete.

Please contact Rick Fry for inspection time. Phone #: ###-####
Plan assigned to (Stumbaugh)1/21/2020 1/22/2020 DONE
DetailsMark Stumbaugh
as build per Dan from TVFP- to show ceiling grid
Sprinkler Plan Check1/22/2020 1/22/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  1/22/2020 DONE
DetailsMark Stumbaugh
Review Time 1 hr
Minus 17 devices
Permit Ready to Issue  1/22/2020 DONE
plan mod met
CHANGE STATUS TO (ISS)  1/22/2020 DONE
INSP-Final Inspection1/20/20201/21/20201/21/2020PCANC
DetailsJim Page
Fire alarm inspection is scheduled for 22JAN2020, this inspection will need to be rescheduled to coincide with final fire alarm inspection, this request is cancelled.

Please contact Rick Fry for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
Plan resubmittals received  1/21/2020 DONE
as build per Dan from TVFP- to show ceiling grid
INSP-Sprinkler Rough-in/Hydro1/15/20201/16/20201/16/2020PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided guage.

Please contact Troy Nelson for an inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in1/16/20201/16/20201/16/2020PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete. Notated city approved plans with red ink areas approved for cover. South side tenant spaces show grided ceiling being installed, grid to be installed with future tenants. City approved plans need to reflect deletion of pendant heads.
INSP-Sprinkler Rough-in11/13/201911/13/201911/13/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in11/1/201911/1/201911/1/2019PFAIL
DetailsTroy Cobbley
No city approved plans or small documents on site. I noted there will be an issue with the FDC placement in relation to the wall post indicator.

Please contact Cameron for inspection time for this afternoon. Call for a morning time inspection if possible. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in/Hydro8/26/20198/26/20198/26/2019PPASS
DetailsTroy Cobbley
Underground hydro witnessed.

Troy will call when ready for inspection. This inspection is for an underground service Hydro-test. Phone #: ###-#### Inspection requested via web by Daniel Buccino
Issue and Print Permit  8/16/2019 DONE
(F) Reprint permit  8/16/2019 DONE
Sprinkler Plan Check8/13/2019 8/15/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  8/15/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  8/15/2019  
Intake Approval  8/13/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)8/13/2019 8/13/2019 DONE
DetailsMark Stumbaugh
Application received  8/8/2019 DONE
Application submitted via PDS Online on Aug 8 2019 1:16PM