INSP-Final Inspection | 10/3/2019 | 10/4/2019 | 10/4/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Javier Blanco Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Final Inspection | 10/3/2019 | 10/4/2019 | 10/3/2019 | A | CANC |
Troy Cobbley
|
|
|
Mike Oswald Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist Inspection cancelled from web by: Brodie Stenquist
|
INSP-Sprinkler Rough-in | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Troy Cobbley
|
|
|
The three pendant heads in the hard lid are ok for cover. mIKE Phone #: ###-####
|
Issue and Print Permit | | | 8/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/15/2019 | | 8/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/15/2019 | | 8/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/13/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit to be issued
|
Application received | | | 8/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2019 2:38PM
|