INSP-Final Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work complete.
Brian Phone #: ###-####
|
Plan assigned to (Lee) | 11/4/2019 | | 11/5/2019 | | DONE |
Lee G Meredith
|
|
|
plan mod
|
1st review completed | | | 11/5/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 11/5/2019 | | 11/5/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/5/2019 | | DONE |
|
|
|
Plan mod passed. Minimum $65 review fee is due.
|
Permit Ready to Issue | | | 11/5/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 11/5/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/4/2019 | | DONE |
|
|
|
as built
|
INSP-Final Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Jim Page
|
|
|
Partial final inspection for fire alarm complete, 2 devices to be added in discussed location and sync issue needs to be resolved. Per conversation with Ron Johnson, a 30 day TCO for employee training only is authorized.
|
Plan assigned to (Lee) | 10/29/2019 | | 10/30/2019 | | DONE |
Lee G Meredith
|
|
|
as built -address changes on the panel and relocated nat panel and smoke detector to office per Kristen
|
1st review completed | | | 10/30/2019 | | DONE |
|
|
|
|
Alarm Plan Check | 10/30/2019 | | 10/30/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/30/2019 | | DONE |
|
|
|
As built - No fee.
|
CHANGE STATUS TO (ISS) | | | 10/30/2019 | | DONE |
|
|
|
as built approved no fee per Lee
|
Plan Modification Accepted | | | 10/29/2019 | | DONE |
|
|
|
as built -address changes on the panel and relocated nat panel and smoke detector to office per Kristen
|
Application received | | | 8/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 12 2019 9:01AM
|
Plan assigned to (Lee) | 8/12/2019 | | 8/12/2019 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/12/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/12/2019 | | 8/12/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/12/2019 | | DONE |
|
|
|
Passed with review comments.
|
Permit Ready to Issue | | | 8/12/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/12/2019 | | DONE |
|
|
|
|