INSP-Final Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Adam Phone #: ###-####
|
Issue and Print Permit | | | 9/17/2019 | | DONE |
|
|
|
met
|
Intake Approval | | | 9/16/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/16/2019 | | 9/16/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/16/2019 | | 9/16/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/13/2019 | | FAIL |
Mark Stumbaugh
|
|
|
Awaiting BLD permit issuance
|
Application received | | | 8/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 12 2019 3:56PM
|