INSP-Final Inspection | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Per the general contractor the restroom walls will be extended to the ceiling. Plans are on site Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Issue and Print Permit | | | 8/20/2019 | | DONE |
|
|
|
|
Application received | | | 8/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2019 2:46PM
|
Intake Approval | | | 8/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/19/2019 | | 8/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/19/2019 | | 8/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/19/2019 | | DONE |
|
|
|
|