INSP-Final Inspection | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | CANC |
Troy Cobbley
|
|
|
*Inspection was done on 9/16/2019* MAS**
Charles Lamb is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Troy Cobbley
|
|
|
*Passed * MAS**
Charles Lamb is the contact for this final inspection. He would like the soonest time slot you have. We appreciate your help. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 9/3/2019 | 9/6/2019 | 9/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need the existing insulation secured back to the deck, need ceiling tile and T bar installed. I also noted that two heads outside of the scope of work are not the min. 6' apart. This will need to be addressed prior to a final building sign off. Kyle Koepnick is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Application received | | | 8/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2019 7:45AM
|
Intake Approval | | | 8/21/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/21/2019 | | 8/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/21/2019 | | 8/21/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/21/2019 | | |
|
|
|
met
|
Issue and Print Permit | | | 8/21/2019 | | DONE |
|
|
|
|