INSP-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. #: ###-#### Inspection requested via web by Sam Ball
|
Issue and Print Permit | | | 8/28/2019 | | DONE |
|
|
|
|
Intake Approval | | | 8/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/26/2019 | | 8/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/26/2019 | | 8/26/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
|
Application received | | | 8/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 22 2019 11:28AM
|