INSP-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 9/12/2019 | 9/17/2019 | 9/17/2019 | A | CANC |
Jim Page
|
|
|
This inspection will need to be done at 7:00am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
Intake Approval | | | 8/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 8/30/2019 | | 8/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/30/2019 | | 8/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 8/30/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 8/30/2019 | | DONE |
|
|
|
|
Application received | | | 8/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2019 4:24PM
|