INSP-Final Inspection | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints;. Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Issue and Print Permit | | | 9/6/2019 | | DONE |
|
|
|
|
Application received | | | 9/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2019 9:15AM
|
Intake Approval | | | 9/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/5/2019 | | 9/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/5/2019 | | 9/5/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/5/2019 | | DONE |
|
|
|
|