Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR19-00673
StatusFinaled
Name JOHNSON CONTROLS FIRE PROTECTION SE
Site Address 781 W FRONT ST
Project NameVoice Box Sprinkler
Customer Number 
ePlanReviewYes
Description
Voice Box Sprinkler - Install and/or relocate approx 60 sprinkler heads in the remodeled tenant space. All sprinklers will be hard piped without using flex drops.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/10/201912/11/201912/11/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final fire sprinkler inspection is complete.

BRYAN Phone #: ###-####
Fees Due Hold12/6/2019 12/10/2019 DONE
Details
INSP-Final Inspection12/4/201912/5/201912/5/2019AFAIL
DetailsJim Page
Upright heads throughout space are painted, painted heads are not acceptable per NFPA13.

Damian Phone #: ###-####
INSP-Final Inspection12/3/201912/4/201912/4/2019AFAIL
DetailsTroy Cobbley
***Escutcheons painted in sounds rooms. Heads to close to sound baffles in sound rooms. MAS**
Damien Phone #: ###-####
CHANGE STATUS TO (ISS)  10/4/2019 DONE
Plan assigned to (Stumbaugh)9/25/2019 9/26/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check9/26/2019 9/26/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/26/2019 DONE
DetailsMark Stumbaugh
Plan Mod Fee $150.00
Permit Ready to Issue  9/26/2019  
plan mod approved
Plan Modification Accepted  9/25/2019 DONE
as built
INSP-Sprinkler Rough-in9/13/20199/16/20199/16/2019PCANC
DetailsJim Page
**Inspection done on 9/16/2019*MAS**
Todd Phone #: ###-####
INSP-Sprinkler Rough-in9/16/20199/16/20199/16/2019PPASS
DetailsJim Page
**Passed Above Ceiling. As built drawings needed before final inspection*MAS**
Todd Phone #: ###-####
Plan resubmittals received  9/11/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check9/11/2019 9/11/2019 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  9/11/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check9/11/2019 9/11/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/11/2019 DONE
DetailsMark Stumbaugh
Add resubmittal fee $110.25
Permit Ready to Issue  9/11/2019 DONE
met
Issue and Print Permit  9/11/2019 DONE
Sprinkler Plan Check9/6/2019 9/10/2019 FAIL
DetailsMark Stumbaugh
Application received  9/6/2019 DONE
Application submitted via PDS Online on Sep 6 2019 9:39AM
Intake Approval  9/6/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  9/6/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)9/6/2019 9/6/2019 DONE
DetailsMark Stumbaugh