INSP-Final Inspection | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Adien Phone #: ###-####
|
Issue and Print Permit | | | 9/9/2019 | | DONE |
|
|
|
|
Application received | | | 9/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 6 2019 2:56PM
|
Intake Approval | | | 9/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/6/2019 | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/6/2019 | | 9/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/6/2019 | | DONE |
|
|
|
|