Plan resubmittals received | | | 2/7/2020 | | DONE |
|
|
|
as built
|
Plan assigned to (Lee) | 2/7/2020 | | 2/7/2020 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 2/7/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 2/7/2020 | | 2/7/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 2/7/2020 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 2/7/2020 | | DONE |
|
|
|
as built approved
|
INSP-Final Inspection | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | FAIL |
Troy Cobbley
|
|
|
No testing performed. The communicator needs to be installed in an area where it will meet its UL listing (temperature in this case). Also per the UL listing it needs to be installed in the same room and with-in 20'-0".
We would like this inspection to be performed at 9:00 am per the occupant''s request. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
INSP-Final Inspection | 10/25/2019 | 10/29/2019 | 10/29/2019 | A | FAIL |
Troy Cobbley
|
|
|
The owner did not show up to provide access.
The site would like the inspection for 9:30 am or 10:00 am if possible. Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
Plan assigned to (Lee) | 9/10/2019 | | 9/10/2019 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 9/10/2019 | | DONE |
|
|
|
Emailed Lori for more detail regarding which type of communicaiton format is to be used. She responded by modifying the drawing to clarify cellular signals and resubmitted.
|
1st review completed | | | 9/10/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/10/2019 | | 9/10/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/10/2019 | | DONE |
|
|
|
Passed. No review comments.
|
Permit Ready to Issue | | | 9/10/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/10/2019 | | DONE |
|
|
|
|
Application received | | | 9/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 9 2019 4:51PM
|