INSP-Final Inspection | 12/16/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the two locations where piping is ok for cover. I noted that the insulation that is falling from the deck will need repaired prior to anymore cover inspections. Phone #: ###-#### Inspection requested via web by Connie Danes
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/16/2019 | | DONE |
|
|
|
|
Intake Approval | | | 9/13/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/13/2019 | | 9/13/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/13/2019 | | 9/13/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/13/2019 | | DONE |
|
|
|
|
Application received | | | 9/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 12 2019 11:24PM
|