INSP-Final Inspection | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
Intake Approval | | | 9/16/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/16/2019 | | 9/16/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/16/2019 | | 9/16/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/16/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/16/2019 | | DONE |
|
|
|
|
Application received | | | 9/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 13 2019 12:52PM
|