Permit Information
Permit NumberFIR19-00703
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1290 W MYRTLE ST
Project NameUS ATTORNEY TI 5TH FLOOR
Customer Number 
ePlanReviewYes
Description
INSTALL NEW PENDENT AND UPRIGHT SPRINKLER HEADS TO THE NEW WALL AND CEILING LAYOUT. Includes some work on 4th floor.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/6/20202/7/20202/7/2020APASS
DetailsJim Page
Final fire sprinkler ispection for scope of work complete.

MIKE OSWALD Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in1/20/20201/21/20201/21/2020APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 4 complete, 2 heads are less than 4 inches off of wall/corner of wall, a minimum of 4 inches is required. Will verfiy relocate during final inspection. Cover is approved.

Mike Oswald-4th floor please Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in1/13/20201/13/20201/13/2020PPART
DetailsJim Page
Rough to cover inspection for remaining level 5 overhead fire sprinkler piping complete, level 5 approved for cover.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in1/7/20201/7/20201/7/2020APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping east of column line 5 complete, area inspected is notated on city approved drawings with red ink, approved for cover east of column line 5.

MIKE OSWALD Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in11/19/201911/19/201911/19/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in scope of work complete, hardlids approved for cover.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in10/10/201910/10/201910/10/2019PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in hardlid dome area complete, area inspected approved for cover, remaining areas to be inspected at a later date.

rough to cover // Mike Phone #: ###-####
Sprinkler Plan Check9/17/2019 9/19/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/19/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  9/19/2019 DONE
Issue and Print Permit  9/19/2019  
Intake Approval  9/17/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)9/17/2019 9/17/2019 DONE
DetailsMark Stumbaugh
Application received  9/16/2019 DONE
Application submitted via PDS Online on Sep 16 2019 3:27PM