Fees Due Hold | 10/11/2019 | | 12/16/2019 | | DONE |
Gemma Flores
|
|
|
|
INSP-Final Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for areas of work complete.
|
INSP-Final Inspection | 10/9/2019 | 10/10/2019 | 10/10/2019 | P | CANC |
Jim Page
|
|
|
Permit has fees due at time of inspection request, per conversation with Joe Bruce, Fire Section Supervisor, fees must be paid before inspection can be performed, this request is cancelled and a new inspection will need to be requested after fees are paid.
Chris Phone #: ###-####
|
Fees Due Hold | 10/10/2019 | | 10/10/2019 | | DONE |
Tisha Gallop
|
|
|
|
Fees Due Hold | 9/19/2019 | | 10/9/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Plan Modification Accepted | | | 10/9/2019 | | DONE |
|
|
|
plan mod request by Chris G. to upload on Eplan
|
Plan assigned to (Stumbaugh) | 10/9/2019 | | 10/9/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
1st review completed | | | 10/9/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/9/2019 | | 10/9/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2019 | | DONE |
Mark Stumbaugh
|
|
|
As built drawings for archiving
|
Permit Ready to Issue | | | 10/9/2019 | | DONE |
|
|
|
as built approved
|
CHANGE STATUS TO (ISS) | | | 10/9/2019 | | |
|
|
|
|
Intake Approval | | | 9/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/18/2019 | | 9/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/18/2019 | | 9/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
No Associated BLD permit.
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/18/2019 | | DONE |
|
|
|
|
Application received | | | 9/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2019 3:37PM
|