Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR19-00709
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron B51- add 4 heads
Customer Number 
ePlanReviewYes
Description
**QUICK PERMIT** No associated BLD permit. Adding 3 heads at insulated hydronic piping rack obstruction and adding 1 head at ductwork obstruction.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fees Due Hold10/11/2019 12/16/2019 DONE
DetailsGemma Flores
INSP-Final Inspection10/11/201910/11/201910/11/2019APASS
DetailsJim Page
Final fire sprinkler inspection for areas of work complete.
INSP-Final Inspection10/9/201910/10/201910/10/2019PCANC
DetailsJim Page
Permit has fees due at time of inspection request, per conversation with Joe Bruce, Fire Section Supervisor, fees must be paid before inspection can be performed, this request is cancelled and a new inspection will need to be requested after fees are paid.

Chris Phone #: ###-####
Fees Due Hold10/10/2019 10/10/2019 DONE
DetailsTisha Gallop
Fees Due Hold9/19/2019 10/9/2019 DONE
DetailsTiffany Carson-Herker
Plan Modification Accepted  10/9/2019 DONE
plan mod request by Chris G. to upload on Eplan
Plan assigned to (Stumbaugh)10/9/2019 10/9/2019 DONE
DetailsMark Stumbaugh
plan mod
1st review completed  10/9/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check10/9/2019 10/9/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/9/2019 DONE
DetailsMark Stumbaugh
As built drawings for archiving
Permit Ready to Issue  10/9/2019 DONE
as built approved
CHANGE STATUS TO (ISS)  10/9/2019  
Intake Approval  9/18/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)9/18/2019 9/18/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check9/18/2019 9/18/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/18/2019 DONE
DetailsMark Stumbaugh
No Associated BLD permit.
Permit Ready to Issue  9/18/2019 DONE
met
Issue and Print Permit  9/18/2019 DONE
Application received  9/17/2019 DONE
Application submitted via PDS Online on Sep 17 2019 3:37PM