INSP-Final Inspection | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Plugged 4 sprinkler drops that were in the middle of nowhere. Spoke with Mark Stumbaugh and he had us do a design letter instead of drawings. Approved design letter and permit are on site in a folder at the front desk of the store. Phone #: ###-#### Inspection requested via web by Matt Barnard
|
Issue and Print Permit | | | 9/23/2019 | | DONE |
|
|
|
|
Application received | | | 9/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 18 2019 10:40AM
|
Intake Approval | | | 9/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/18/2019 | | 9/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/18/2019 | | 9/18/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
|