Information based on query as of Monday, July 15, 2024.
Permit Information
Permit NumberFIR19-00711
StatusFinaled
Name LOCAL FIRE AND SECURITY
Site Address 2323 S VISTA AVE Unit: 205
Project NameSuite 205 TI
Customer Number 
ePlanReviewYes
Description
Restrooms are being modified for Suite 205, 30 cd Horn/strobe is required in each restroom. This work is associated with BLD19-03036.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/15/20205/19/20205/19/2020PPASS
DetailsTroy Cobbley
Life safety passed. Drew Phone #: ###-####
INSP-Final Inspection11/25/201911/26/201911/26/2019AFAIL
DetailsTroy Cobbley
Provide plan modifications showing the actual floor layout and needed notification layout. No testing was performed. I noted that there is an audible sync issue present while testing a first floor modification.

Drew Phone #: ###-####
Plan resubmittals received  11/26/2019 DONE
Mary requested the work flow to be opened for as builts
Plan assigned to (Lee)11/26/2019 11/26/2019 DONE
DetailsLee G Meredith
as builts
Plan assigned to (Lee)11/26/2019 11/26/2019 DONE
DetailsLee G Meredith
1st review completed  11/26/2019 DONE
Alarm Plan Check11/26/2019 11/26/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  11/26/2019 DONE
As built - No Fee
Permit Ready to Issue  11/26/2019 DONE
CHANGE STATUS TO (ISS)  11/26/2019 DONE
as built no fees per lee
Issue and Print Permit  9/23/2019 DONE
Plan assigned to (Lee)9/20/2019 9/20/2019 DONE
DetailsLee G Meredith
1st review completed  9/20/2019 FAIL
Strobe coverage is inadequate, based on scale bar reference.
Plan resubmittals received  9/20/2019 DONE
Alarm Plan Check9/20/2019 9/20/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  9/20/2019 DONE
Quick permit passed. No comments.
Permit Ready to Issue  9/20/2019 DONE
Plan resubmittals received  9/19/2019 DONE
per Mary wrong plans were turned in
CHANGE STATUS TO (REV)  9/19/2019 DONE
Application received  9/18/2019 DONE
Application submitted via PDS Online on Sep 18 2019 12:46PM
Plan assigned to (Lee)9/18/2019 9/18/2019 DONE
DetailsLee G Meredith
1st review completed  9/18/2019 PASS
Alarm Plan Check9/18/2019 9/18/2019 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  9/18/2019 DONE
Quick permit passed. No comments.
Permit Ready to Issue  9/18/2019 DONE