Permit Information
Permit NumberFIR19-00712
StatusIssued
Name ABSOLUTE FIRE PROTECTION
Site Address 2260 N HARRISON BLVD
Project NameHarrison Hills Apt Storage
Customer Number 
ePlanReviewYes
Description
Deficiency Repair- Add piping and sprinklers for Basement Storage rooms, OH2 design.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/20/20202/20/20202/20/2020PPART
DetailsJim Page
Partial final inspection for scope of work has been completed. Project was reviewed under the 2015 IFC and the 2016 NFPA13 system. IFC Chapter 9, section 903.4 requires monitoring of fire sprinkler systems, this project does not meet any of the exceptions listed under 903.4. Fire sprinkler monitoring will be required due to the scope of work, a seperate FIR permit is required for any and all modifications to a fire alarm system.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro11/8/201911/8/201911/8/2019PPASS
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro11/8/201911/8/201911/8/2019PPASS
DetailsJim Page
Rough to cover/rough in inspection for overhead fire sprinkler piping in scope of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball
CHANGE STATUS TO (ISS)  10/28/2019 DONE
PLAN MOD
Plan assigned to (Stumbaugh)9/24/2019 10/2/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check10/2/2019 10/2/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/2/2019 DONE
Review Time 1hr
Permit Ready to Issue  10/2/2019 DONE
Plan Modification Accepted  9/24/2019 DONE
add a backflow
Intake Approval  9/19/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)9/19/2019 9/19/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check9/19/2019 9/19/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  9/19/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  9/19/2019 DONE
Issue and Print Permit  9/19/2019 DONE
(F) Reprint permit  9/19/2019 DONE
Application received  9/18/2019 DONE
Application submitted via PDS Online on Sep 18 2019 12:54PM