INSP-Final Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
INSP-Sprinkler Rough-in | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Payton Phone #: ###-####
|
Issue and Print Permit | | | 9/20/2019 | | DONE |
|
|
|
|
Application received | | | 9/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2019 2:45PM
|
Intake Approval | | | 9/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/19/2019 | | 9/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/19/2019 | | 9/19/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/19/2019 | | DONE |
|
|
|
|