INSP-Final Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Rick Phone #: ###-####
|
INSP-Final Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, inspection will be rescheduled for a later date.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2019 | 11/5/2019 | 11/5/2019 | P | PASS |
Jim Page
|
|
|
Rough to cover ispection for overhead fire sprinkler piping in area of work complete, approved for cover.
Rick Phone #: ###-####
|
Intake Approval | | | 9/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/23/2019 | | 9/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/23/2019 | | 9/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
No associated BLD permit.
|
Permit Ready to Issue | | | 9/23/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 9/23/2019 | | DONE |
|
|
|
|
Application received | | | 9/20/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 20 2019 2:05PM
|