INSP-Final Inspection | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in approved.
Approved plans are on site. There are no new ceilings being installed, this rough in is to make sure everything looks good before we schedule a final. Please call Matt before heading to the site at Phone #: ###-#### Inspection requested via web by Matt Barnard
|
Application received | | | 9/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 30 2019 10:38AM
|
Intake Approval | | | 9/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 9/30/2019 | | 9/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 9/30/2019 | | 9/30/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 9/30/2019 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/30/2019 | | DONE |
|
|
|
|