Permit Information
Permit NumberFIR19-00748
StatusIssued
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3027 N COLE RD
Project NameASIAN PLAZA RETROFIT
Customer Number 
ePlanReviewYes
Description
UG AND OH RETROFIT OF EXISTING BUILDING FOR CORE & SHELL ONLY.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro7/1/20207/2/20207/2/2020ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Shell Hydro; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in2/4/20202/5/20202/5/2020PPART
DetailsTroy Cobbley
The previous corrections have been addressed. However new permits will be required for tenant work. No piping to be covered without additional permits.



Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in11/27/201912/2/201912/2/2019APART
DetailsTroy Cobbley
General rough-in passed. See the city approved drawings for corrections needed. Piping from top of riser to first main is shown to be 2 1/2" but 2" is installed, the uprights on one branchline have insulation/backing laying on them, one upright in the southwest corner of building exceeds 12" from roof deck, backflow installed is 3" where as the plans show 2 1/2" to be installed.


Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Supply line flush11/18/201911/19/201911/19/2019APASS
DetailsTroy Cobbley
The underground flush witnessed.

Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in/Hydro11/18/201911/18/201911/18/2019PPASS
DetailsTroy Cobbley
UG Hydro witnessed.. Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Supply line flush11/14/201911/15/201911/15/2019PPASS
DetailsTroy Cobbley
The underground supply piping is ok for cover.

troy nelson
u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in/Hydro10/23/201910/23/201910/23/2019PPASS
DetailsTroy Cobbley
Underground hydro test witnessed with no pressure loss.

Please call Troy Nelson. Underground Hydro Phone #: ###-#### Inspection requested via web by Daniel Buccino
Issue and Print Permit  10/18/2019 DONE
Plan resubmittals received  10/17/2019 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check10/17/2019 10/17/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  10/17/2019 DONE
DetailsMark Stumbaugh
No associated BLD permit.
Permit Ready to Issue  10/17/2019 DONE
met
Plan resubmittals received  10/8/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check10/8/2019 10/8/2019 FAIL
DetailsMark Stumbaugh
Sprinkler Plan Check10/1/2019 10/7/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  10/1/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/1/2019 10/1/2019 DONE
DetailsMark Stumbaugh
Application received  9/30/2019 DONE
Application submitted via PDS Online on Sep 30 2019 1:15PM