INSP-Sprinkler Rough-in/Hydro | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Shell Hydro; Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | PART |
Troy Cobbley
|
|
|
The previous corrections have been addressed. However new permits will be required for tenant work. No piping to be covered without additional permits.
Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in | 11/27/2019 | 12/2/2019 | 12/2/2019 | A | PART |
Troy Cobbley
|
|
|
General rough-in passed. See the city approved drawings for corrections needed. Piping from top of riser to first main is shown to be 2 1/2" but 2" is installed, the uprights on one branchline have insulation/backing laying on them, one upright in the southwest corner of building exceeds 12" from roof deck, backflow installed is 3" where as the plans show 2 1/2" to be installed.
Terry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Supply line flush | 11/18/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground flush witnessed.
Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 11/18/2019 | 11/18/2019 | 11/18/2019 | P | PASS |
Troy Cobbley
|
|
|
UG Hydro witnessed.. Troy Nelson Phone #: ###-#### Inspection requested via web by Nathan Stenquist
|
INSP-Supply line flush | 11/14/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok for cover.
troy nelson u.g. cover Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test witnessed with no pressure loss.
Please call Troy Nelson. Underground Hydro Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
Issue and Print Permit | | | 10/18/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/17/2019 | | 10/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
No associated BLD permit.
|
Permit Ready to Issue | | | 10/17/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 10/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/8/2019 | | 10/8/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/1/2019 | | 10/7/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/1/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/1/2019 | | 10/1/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 9/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 30 2019 1:15PM
|