INSP-Final Inspection | 1/6/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete. Signature provide on the BLD permit sign off card.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Rick Phone #: ###-####
|
Fees Due Hold | 10/10/2019 | | 10/10/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/2/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/2/2019 | | 10/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/2/2019 | | 10/2/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 10/2/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/2/2019 | | DONE |
|
|
|
|
Application received | | | 10/1/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 1 2019 3:54PM
|