INSP-Final Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Mike Phone #: ###-####
|
Override - Parcel Holds | 12/5/2019 | 1/1/1900 | 12/5/2019 | | |
|
|
|
.
|
INSP-Sprinkler Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
mike oswald Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Issue and Print Permit | | | 10/9/2019 | | DONE |
|
|
|
|
Application received | | | 10/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2019 10:11AM
|
Intake Approval | | | 10/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/8/2019 | | 10/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/8/2019 | | 10/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
Base Fee $175.00
Devices 13 X 4.85 = $63.05
Total Fee $238.05
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
MET
|