INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line rough-in passed. Piping is ok for cover.
screened // Mike Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/4/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/2/2020 | | 6/3/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2020 | | DONE |
Mark Stumbaugh
|
|
|
As Built Drawings - No Fee
|
Permit Ready to Issue | | | 6/3/2020 | | DONE |
|
|
|
PLAN MOD
|
Plan resubmittals received | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 5/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Plans resubmitted without any changes from last submittal. Returned to applicant
|
Sprinkler Plan Check | 5/26/2020 | | 5/28/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 5/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
Emailed Bill with Alpine fire explaining what was need on as built drawings(attached in docs)
|
Plan assigned to (Stumbaugh) | 5/21/2020 | | 5/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
as builts
|
Plan resubmittals received | | | 5/21/2020 | | DONE |
|
|
|
As Builts per Bill Corbit
|
CHANGE STATUS TO (ISS) | | | 4/1/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 3/18/2020 | | 3/24/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/24/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/24/2020 | | 3/24/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/24/2020 | | DONE |
|
|
|
Plan mod passed. Minimum of $65 for review fee is due.
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
plan mod met
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Issue and Print Permit | | | 12/5/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 12/4/2019 | | 12/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
met
|
Sprinkler Plan Check | 11/22/2019 | | 11/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 11/22/2019 | | 11/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 11/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/23/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 3:33PM
|