INSP-Conference | 6/18/2020 | 6/19/2020 | 6/19/2020 | A | DONE |
Troy Cobbley
|
|
|
Per Tanner the mains need to be relocated on all floors. I will need as-builts/plan mods that show the actual installed location of all piping.
Phone #: ###-####
|
INSP-Sprinkler Rough-in | 5/29/2020 | 6/1/2020 | 6/1/2020 | A | CANC |
Troy Cobbley
|
|
|
screened // Tanner Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/1/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 3/18/2020 | | 3/24/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/24/2020 | | DONE |
|
|
|
|
Alarm Plan Check | 3/24/2020 | | 3/24/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/24/2020 | | DONE |
|
|
|
Plan mod passed. Minimum of $65 for review fee is due.
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
plan mod met
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
plan mod request to add heat trace for the sprinkler system
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Troy Cobbley
|
|
|
The unnderground hydro test was witnessed. Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover. Kile Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line is ok for cover from the point of connection to the IBR. The IBR has not been installed yet and will require another inspection.
cover // Kyle Phone #: ###-####
|
Issue and Print Permit | | | 12/10/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 12/4/2019 | | 12/4/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
met
|
Sprinkler Plan Check | 12/2/2019 | | 12/3/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 12/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/22/2019 | | 11/25/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/20/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/23/2019 | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/23/2019 | | 10/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 3:36PM
|