INSP-Sprinkler Rough-in | 7/15/2020 | 7/16/2020 | 7/16/2020 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the soffits on all floors is ok for cover.
Mike Phone #: ###-#### **Rescheduled by JHB to 7/16 in AM after phone conversation with Mike**
|
INSP-Sprinkler Rough-in | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Insulation for breezeway piping installed. All piping is ok for cover. Still need the head added to the 4th floor roof access room as discussed. Mike Phone #: ###-####
|
Telephone call | | | 6/18/2020 | | DONE |
|
|
|
emailed bill about fees
|
Plan assigned to (Stumbaugh) | 6/16/2020 | | 6/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
as builts
|
Sprinkler Plan Check | 6/17/2020 | | 6/17/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review time 1 hr
|
Permit Ready to Issue | | | 6/17/2020 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 6/17/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/16/2020 | | DONE |
|
|
|
as builts requested by Bill from Alpine
|
INSP-Sprinkler Rough-in | 6/15/2020 | 6/15/2020 | 6/15/2020 | P | FAIL |
Troy Cobbley
|
|
|
The rough-in for the most part is good. But the 2" main piping is not shown for one feed and installed in the wrong size for the other feed. Plans need to show the heads in the closets on the 4th floor. Need insulation on breeze way piping, Need tenting repaired on the 4th and 3rd floors. It appears the standpipe may be in the wrong location. Need sprinkler coverage in the Roof Access/FACP room. Tanner *screened* Phone #: ###-####
|
Permit Ready to Issue | | | 6/5/2020 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 6/5/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/2/2020 | | 6/4/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2020 | | DONE |
Mark Stumbaugh
|
|
|
As Built Drawings - No Fee
|
Plan resubmittals received | | | 6/2/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 5/29/2020 | | FAIL |
Mark Stumbaugh
|
|
|
Plans resubmitted without any changes from last submittal. Returned to applicant
|
Sprinkler Plan Check | 5/26/2020 | | 5/28/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Miscellaneous action | | | 5/28/2020 | | DONE |
Mark Stumbaugh
|
|
|
Emailed Bill with Alpine fire explaining what was need on as built drawings(attached in docs)
|
Plan assigned to (Stumbaugh) | 5/21/2020 | | 5/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
as built
|
Plan resubmittals received | | | 5/21/2020 | | DONE |
|
|
|
as built reqest by Bill Corbit
|
CHANGE STATUS TO (ISS) | | | 4/1/2020 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 3/24/2020 | | 3/24/2020 | | DONE |
Lee G Meredith
|
|
|
|
Intake Approval | | | 3/24/2020 | | PASS |
|
|
|
|
1st review completed | | | 3/24/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/24/2020 | | 3/24/2020 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/24/2020 | | DONE |
|
|
|
Plan mod passed. Minimum of $65 for review fee is due.
|
Permit Ready to Issue | | | 3/24/2020 | | DONE |
|
|
|
plan mod met
|
Plan Modification Accepted | | | 3/18/2020 | | DONE |
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Plan assigned to (Stumbaugh) | 3/18/2020 | | 3/18/2020 | | DONE |
Lee G Meredith
|
|
|
plan mod request to add heat trace for the sprinkler system
|
Sprinkler Plan Check | 12/2/2019 | | 12/3/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 12/3/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 12/3/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/3/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/2/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/22/2019 | | 11/22/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan resubmittals received | | | 11/20/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/23/2019 | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/28/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 10/23/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/23/2019 | | 10/23/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 3:45PM
|