INSP-Final Inspection | 11/19/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Rick Fry to coincide with the fire/life safety final Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Final Inspection | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | FAIL |
Troy Cobbley
|
|
|
Not all ceiling tile has been installed and some portions of the tenant space are not accessible due to flooring being installed. jon olmstead Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 11/1/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Jon Holmstead Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
Permit Ready to Issue | | | 10/23/2019 | | DONE |
|
|
|
met
|
Issue and Print Permit | | | 10/23/2019 | | DONE |
|
|
|
|
Application received | | | 10/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 22 2019 1:25PM
|
Intake Approval | | | 10/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/22/2019 | | 10/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/22/2019 | | 10/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 10/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|