Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR19-00804
StatusIssued
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1118 W IDAHO ST
Project Name11th and Idaho
Customer Number 
ePlanReviewYes
Description
10 story commercial office building
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in8/5/20208/5/20208/5/2020PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above restroom hardlids 2 through 9 complete, restroom hardlids 2 through 9 approved for cover.

Inspections for rough to cover in bathrooms, floors 2-9. Phone #: ###-#### Inspection requested via web by Daniel Buccino
INSP-Sprinkler Rough-in6/29/20206/30/20206/30/2020APASS
DetailsTroy Cobbley
The west stairs stand pipe and drain is ok for cover.

someone was tested positive, last time on the job site was monday (6-22-2020) // mike Phone #: ###-####
INSP-Sprinkler Rough-in6/2/20206/2/20206/2/2020PPART
DetailsJim Page
Inspection for preset hangers at top of stair towers complete, preset hangers approved for cover.

mike Phone #: ###-####
INSP-Supply line flush5/12/20205/20/20205/20/2020ACANC
DetailsJim Page
Dan - 6am inspection, must pay fee before inspection is performed. Approved by Jim Page Phone #: ###-####

Inspection needs to be on FIR19-00674
INSP-Sprinkler Rough-in4/2/20204/2/20204/2/2020PDONE
DetailsJim Page
FDC has been relocated to the Idaho St side of the building.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in2/20/20202/20/20202/20/2020PDONE
DetailsJim Page
Temporary standpipe has been installed, located on the east side of building with temp stairs. Temp standpipe is in service.

Mike Phone #: ###-####
Plan resubmittals received  2/13/2020 PASS
DetailsMark Stumbaugh
Sprinkler Plan Check2/13/2020 2/13/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  2/13/2020 DONE
DetailsMark Stumbaugh
Review time 3hr
9 added devices
Permit Ready to Issue  2/13/2020 DONE
CHANGE STATUS TO (ISS)  2/13/2020 DONE
Sprinkler Plan Check2/5/2020 2/11/2020 FAIL
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)2/4/2020 2/5/2020 DONE
DetailsMark Stumbaugh
plan mod
Plan Modification Accepted  2/4/2020 DONE
plan mod workflow requested by Dan of Treasure Valley
INSP-Sprinkler Rough-in12/4/201912/4/201912/4/2019PPASS
DetailsJim Page
Rough to cpover inspection for remaining underground supply complete, approved for cover.

Please call Troy Nelson for underground inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
Issue and Print Permit  11/18/2019 DONE
Plan resubmittals received  11/15/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check11/15/2019 11/15/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  11/15/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  11/15/2019 DONE
met
Plan resubmittals received  11/12/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check11/12/2019 11/12/2019 FAIL
DetailsMark Stumbaugh
Sprinkler Plan Check10/25/2019 11/8/2019 FAIL
DetailsMark Stumbaugh
1st review completed  11/8/2019 FAIL
DetailsMark Stumbaugh
Application received  10/25/2019 DONE
Application submitted via PDS Online on Oct 25 2019 12:09PM
Intake Approval  10/25/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/25/2019 10/25/2019 DONE
DetailsMark Stumbaugh