INSP-Sprinkler Rough-in | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above restroom hardlids 2 through 9 complete, restroom hardlids 2 through 9 approved for cover.
Inspections for rough to cover in bathrooms, floors 2-9. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Troy Cobbley
|
|
|
The west stairs stand pipe and drain is ok for cover.
someone was tested positive, last time on the job site was monday (6-22-2020) // mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/2/2020 | 6/2/2020 | 6/2/2020 | P | PART |
Jim Page
|
|
|
Inspection for preset hangers at top of stair towers complete, preset hangers approved for cover.
mike Phone #: ###-####
|
INSP-Supply line flush | 5/12/2020 | 5/20/2020 | 5/20/2020 | A | CANC |
Jim Page
|
|
|
Dan - 6am inspection, must pay fee before inspection is performed. Approved by Jim Page Phone #: ###-####
Inspection needs to be on FIR19-00674
|
INSP-Sprinkler Rough-in | 4/2/2020 | 4/2/2020 | 4/2/2020 | P | DONE |
Jim Page
|
|
|
FDC has been relocated to the Idaho St side of the building.
Mike Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/20/2020 | 2/20/2020 | 2/20/2020 | P | DONE |
Jim Page
|
|
|
Temporary standpipe has been installed, located on the east side of building with temp stairs. Temp standpipe is in service.
Mike Phone #: ###-####
|
Plan resubmittals received | | | 2/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 2/13/2020 | | 2/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review time 3hr
9 added devices
|
Permit Ready to Issue | | | 2/13/2020 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/13/2020 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/5/2020 | | 2/11/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 2/4/2020 | | 2/5/2020 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
Plan Modification Accepted | | | 2/4/2020 | | DONE |
|
|
|
plan mod workflow requested by Dan of Treasure Valley
|
INSP-Sprinkler Rough-in | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Jim Page
|
|
|
Rough to cpover inspection for remaining underground supply complete, approved for cover.
Please call Troy Nelson for underground inspection. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
Issue and Print Permit | | | 11/18/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/15/2019 | | 11/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 11/12/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/12/2019 | | 11/12/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 10/25/2019 | | 11/8/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 11/8/2019 | | FAIL |
Mark Stumbaugh
|
|
|
|
Application received | | | 10/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 25 2019 12:09PM
|
Intake Approval | | | 10/25/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 10/25/2019 | | 10/25/2019 | | DONE |
Mark Stumbaugh
|
|
|
|