INSP-Sprinkler Rough-in | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Jim Page
|
|
|
Area marked with red ink on city approved drawings inspected, area marked is approved for cover.
Parcel in the open office area. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
Issue and Print Permit | | | 8/6/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 8/4/2020 | | 8/5/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 8/5/2020 | | 8/5/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review time 1hr
No New Devices
|
Permit Ready to Issue | | | 8/5/2020 | | DONE |
|
|
|
as built approved
|
Plan Modification Accepted | | | 8/4/2020 | | DONE |
|
|
|
Greg requested a plan mod to be opened
|
INSP-Sprinkler Rough-in | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for phase 5 where piping is ok to cover. I noted one missing brachline restraint that I can check for at the next inspection. ] Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
Issue and Print Permit | | | 11/12/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 11/8/2019 | | 11/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/8/2019 | | 11/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 11/8/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/8/2019 | | DONE |
|
|
|
met
|
Application received | | | 11/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 7 2019 4:20PM
|