INSP-Sprinkler Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PART |
Jim Page
|
|
|
Rough to cover inspwection for underground supply is complete, fittings had to be added for supply, plans are to reflect extra fittings, cover approved at contractors descretion provided calculations still meet demand with extra fittings.
Bryan Collins is the contact. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/21/2020 | 4/21/2020 | 4/21/2020 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for riser section and @ 15 feet of piping complete, area inspected approved for cover, remaining underground piping to be inspected at a later date.
Bryan Collins is the contact. Have a wonderful day!(: Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 11/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 11/15/2019 | | 11/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/15/2019 | | 11/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 11/15/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
met
|
Application received | | | 11/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 14 2019 11:18AM
|