INSP-Final Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Jim Page
|
|
|
Previously noted item has been corrected, rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Jonathan Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | FAIL |
Jim Page
|
|
|
Secire insulation that is resting on and blocking upright sprinkler heads above ceiling grid.
johnathon Phone #: ###-####
|
Issue and Print Permit | | | 11/27/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 11/22/2019 | | 11/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 11/22/2019 | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 11/22/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2019 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 11/22/2019 | | DONE |
|
|
|
met
|
Application received | | | 11/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2019 10:35AM
|